EN 50126-3 PDF

Supersedes CLC/TR English version. Railway applications –. The specification and demonstration of. Reliability, Availability. BS PD CLC/TR Railway applications – The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) – Part 3. Buy CLC/TR Railway Applications – The Specification And Demonstration Of Reliability, Availability, Maintainability And Safety (rams) – Part 3.

Author: Mikalabar Magrel
Country: Saudi Arabia
Language: English (Spanish)
Genre: Health and Food
Published (Last): 22 April 2017
Pages: 114
PDF File Size: 20.6 Mb
ePub File Size: 8.2 Mb
ISBN: 769-5-93553-904-9
Downloads: 4732
Price: Free* [*Free Regsitration Required]
Uploader: JoJole

Size px x x x x However in related standards, such as BS ENclassification has a Following this simple outline, the derivation of detailed sub-categories and costs can be easily carried out and so it makes modelling of LCC possible.

Software for railway em and protection systems. Specification for symbols for circuit diagrams.

AFNOR Editions Online Store

The equipment layout, including their relevant connections, should be arranged in such a way as fn make it possible to easily perform inspections, repairs, revisions, replacement, etc. If the real service operating time for the rolling stock and for its subsystems, assemblies and parts could not be measured, the Customer can choose, as 501126-3, the following: For the purpose of guidance on contractual relations, the entities are divided into 2 main categories, i.

Reliability growth monitoring process is a continuous monitoring of the field data, successive RAM analysis and matching of the results against the targets for contractual requirements.

Based on the above considerations, the RAM Programme could be defined as shown in the following diagram. The process of deriving detailed em for rolling stock should be addressed to cover all the possible and reasonable factors influencing safety by considering fn least the following: Using the above definition the Customer should specify the Reliability Targets for each one of the Failure Categories in terms of: Legal notices Photo credits FAQ.

Hazards are intentionally repeated in the list, under different categories, to highlight and draw attention to them. Terms and Conditions Terms of 50126–3 Online watch. Parameters to be considered are: In this case the Customer should specify which items are counted as maintenance cost and the agreed period of time for counting.

  EL PODER PSICOTRONICO DE LA MENTE PDF

For parts already in use by the customer, he should supply a list.

This publication does not purport to include all the necessary provisions of a contract. Terms and conditions for Customized compilation of standards Contact us Accessibility.

The resultant deliverables 5016-3 the preliminary RAM-related activities are: This definition could be used where the depth of the Breakdown Structure has been defined see 5. We need your help to maintenance this website. NOTE If it is not possible to 5026-3 time to reach maintenance site or to plan maintenance actions, contractual fixed times can be used.

Build a watch list Add to the watch list.

PD CLC/TR – September

Union and other countries. Test yourself or your business online. ISBN – 3 eBook. A list of tools suitable for use to perform the different analyses and to manage all RAM activities is given in Annex B5 of EN Compatibility between rolling stock and train detection systems. Accept and continue Learn more about the cookies we use and how to change your settings.

Dynabrade Product – 3″ (76 mm) Dia. Disc Pad, Hook ‘N Loop

According to the above mentioned definitions and conditions of failures, the Custom er should state: Purchase More information add to basket. Discover also Certification, assessment, diagnosis Get a quote for certification of systems, products or services, and get certified.

It also gives information about activities and documentation during the life cycle phases supporting detailed specifications and requirements for the rolling stock including its systems and sub-systems.

A guide to the application of EN -1 for safety of railway systems In this case two choices can be considered for addressing the target of minimising standstill time: The predicted or observed results of a failure cause on the LRU in relation to the operating conditions at the time of the failure Failure Cause. Option to visualize changes at a glance. Every piece of equipment, device and item of furnishing subject to dismantling for replacement, repair or programmed maintenance should not exceed the weight supportable by a single person and should be capable of being manually handled by a single person.

Since configuration control applies to all project phases see EN Figure 9, Note 1when the project progresses through Phase 10 to Phases 11 and beyond, a suitable Configuration Management System should also be established by the Customer.

  DISPOSITIVOS PULSIONALES PDF

The list should only be considered as an aid for developing a more suitable and coherent list of hazards related to the rolling stock under consideration. The specification and demonstration of reliability, availability, maintainability and safety RAMS. We are a non-profit group that run this website to share documents.

Evaluation of removability of an item should also take into account the possible need for removing parts of the rolling stock structure e. Consecutive number used to identify each maintenance task Maintenance Task Description of the preventive maintenance task Spare Parts and special tools Description of the special equipment not provided by the depot or workshop and in any case not easily available on the market and materials necessary consumables and spares Frequency Frequency of the maintenance task time or Km Maintenance level Codes of the maintenance levels used by the maintainer Personnel Number of persons necessary at the same time for the maintenance task described Skill Level Code of the Skill level requested for the personnel to carry out the maintenance task Spare Parts Cost Unit cost of materials expressed in EURO Man hours Time required for the maintenance task multiplied by the number of persons necessary Standstill time Standstill time for the rolling stock during the maintenance task Total Qty Total no.

Generally, the steady state level is achieved at least after two years of revenue service.

Tables 5 to 7 show the specifications for each Failure Category. Regarding Corrective and Preventive Maintenance Costs, Figures 1 to 3 contain elements useful to build costs of items.

The main purpose of the guide is to: Implemented at functional level, this task aims to highlight the critical RAM functions on which further detailed analyses should focus. For a rolling stock and for its subsystems, assemblies and parts according to the boundary limits defined, 5012-63 are different types of Maintainability Targets: What is RAMS about? All references to EN concern the version of

VPN