AH-64D PPC PDF

The Flight Performance Models (FPMs) embedded in the PPC application are based on flight test data and the performance charts in the AHD Operator’s. This manual provides specific guidelines for executing AHD aircrew Performance planning card (PPC) DA Form R (UH/AH Get the da form 64 r. Description of ah 64d ppc pdf. DEPARTURE PA FAT LOAD TAKEOFF GWT lb SINGLE ENG DUAL ENG FUEL MSN ATF ETF TR MAX .

Author: Zolosho Tolabar
Country: Kuwait
Language: English (Spanish)
Genre: Music
Published (Last): 28 December 2004
Pages: 461
PDF File Size: 17.17 Mb
ePub File Size: 11.67 Mb
ISBN: 343-4-48970-508-9
Downloads: 63315
Price: Free* [*Free Regsitration Required]
Uploader: Maular

Performance planning was a critical part of each mission.

A valuable lesson learned from this deployment is that units should focus early on power management issues and train accordingly so that they are prepared when deployed. By the end of April, the temperature at Kandahar was nearing degrees Fahrenheit. While en route to Khowst, we crossed a snow-covered mountain at 11, MSL. Kandahar is approximately 3, feet mean sea level MSL and can be characterized as high desert.

  KENNETH GERGEN EL YO SATURADO PDF

We quickly learned that power management was a skill necessary to survive our deployment. Each mission required performance ppf for altitudes, temperatures, and gross weights that were much higher than we normally operate.

We had already conducted numerous missions to include Operation Anaconda. Within three weeks of our arrival, our missions started taking us to higher and higher altitudes.

AH Operations In Afghanistan

On a daily basis, we had power available to hover out of ground effect OGE. During the deployment, we were exposed to a wide range of temperatures, a variety of flight environments, and altitude extremes that we had never operated in before. The lpc patterns and running fire tactics we utilized were necessary due to insufficient power to hover and to increase our own survivability.

We adapted to this environment well, but were fortunate to have a wealth of experienced aviators in our company. The terrain is relatively flat with rolling sand dunes 10 miles west and a mountain range approximately 15 miles aah-64d the north.

  FENTES LABIO PALATINES PDF

During the winter poc at Kandahar, our aircraft performed well. I slowly increased the power until I drooped the rotor and then decreased the collective. We knew that it would not be long before power was a luxury that we would not have.

AH-64D Block 2 PPC Book

Our first mission took us from Kandahar to Bagram Airbase to refuel and then on to the eastern city of Khowst.

This cell always contained at least one of the opc instructor pilots. We arrived in Afghanistan near the end of January and were based out of Kandahar International Airport. During our missions in Afghanistan, we had two aviators assigned to our performance-planning cell.

VPN